Closing the file
Legalisation starts by knowing what exists and what is missing
We compare records, installed work and the administrative objective before defining the route.
We review the existing installation, locate available records and define corrections and procedures required to regularise it.
We help define the next step
With the objective, location, stage and available information, we can advise you and prepare a clear scope.
What we resolve
- Locate records and available documentation.
- Compare drawings with the installed system.
- Define outstanding corrections, tests and documents.
What we deliver
- Document review.
- Agreed drawings and technical documentation.
- Included coordination of corrections and close-out.
What we need to start
- Address, owner, installation and available documents.
How we work
A clear process from first information to delivery
- 01
Review file and installation.
- 02
Identify differences and scope.
- 03
Prepare documents and agreed follow-up.
Applications
Projects and teams this service can support
Contractors
On site, programme, interfaces and timely information matter. We set responsibilities, response times and deliverables in the proposal.
02Installation contractors
Collaboration works when design and installation share reliable data, controlled versions and clear responsibilities.
03Developers
We provide engineering where an early decision can prevent costly change and where documentation must keep pace with the completed asset.
04Restaurants
Extract, ventilation, HVAC, power, fire safety, accessibility, escape, noise and health conditions can constrain restaurant premises and refurbishment.
05Retail
The product, storage, customer service and equipment alter the requirements for electricity, HVAC, fire safety and internal logistics.
06Industrial buildings
An industrial building is not defined by structure alone. Use, process, services, fire safety, power and future expansion must be coordinated from the outset.
You may also need
Services that complete the project
Electrical installations
The electrical solution starts from expected loads, distribution, protection and coordination with other services.
02Air conditioning and HVAC
The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.
03Fire safety
We integrate escape, compartmentation and protection systems with layout, building services and intended use.
04Activity projects
An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.
FAQ
Preguntas frecuentes
Can every installation be legalised as it stands?
Not always. We compare its condition, available documents and applicable requirements, then identify the corrections, tests and documents required.
Siguiente paso
