Opening a shop
Sales, storage and services must work together
We assess product, occupancy and premises to coordinate commercial layout, comfort, power and documentation.
The product, storage, customer service and equipment alter the requirements for electricity, HVAC, fire safety and internal logistics.
Typical requirements
- Coordinate sales, storage and staff areas.
- Define HVAC, ventilation, lighting and power.
- Review accessibility, occupancy, escape and fire safety.
Engineering requirements
Services to resolve the project as one coordinated whole
Activity projects
An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.
02Feasibility studies
Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.
03Building-services engineering
We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.
04Air conditioning and HVAC
The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.
05Electrical installations
The electrical solution starts from expected loads, distribution, protection and coordination with other services.
06Fire safety
We integrate escape, compartmentation and protection systems with layout, building services and intended use.
FAQ
Preguntas frecuentes
Do all shops need the same services?
No. Product, floor area, storage, occupancy and equipment determine the technical scope.
Siguiente paso
