Continuous operation
Hotel services designed for delivery and operation
We coordinate comfort, consumption, technical space and intervention phases in buildings with multiple uses and operating hours.
Bedrooms, common areas, kitchens, pools and technical zones need different criteria and careful coordination with operation and construction phases.
Typical requirements
- Coordinate heat generation, ventilation and distribution.
- Define electricity, fire safety, water and zoned controls.
- Prioritise energy improvements while protecting operation.
Engineering requirements
Services to resolve the project as one coordinated whole
Hotel room control
We design and implement room control for hotels that need to manage room consumption, monitor issues and deploy in phases.
02Building-services engineering
We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.
03Air conditioning and HVAC
The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.
04Plant rooms
We design new and existing plant rooms, integrating heat generation, pumping, storage, electricity and controls with building space and operation.
05Electrical installations
The electrical solution starts from expected loads, distribution, protection and coordination with other services.
06Fire safety
We integrate escape, compartmentation and protection systems with layout, building services and intended use.
07CTE compliance and energy certificates
We support architecture practices with the applicable CTE DB-HE checks and energy performance certificates, keeping the calculations connected to the design decisions that produce the result.
FAQ
Preguntas frecuentes
Can you plan a phased refurbishment?
Yes. We define phases around areas that must remain open, shared systems and work that can proceed without blocking hotel operation.
Siguiente paso
