Opening a workshop
Process, equipment and risk define the workshop design package
We start from the process, machinery and materials to assess the premises and services.
A workshop is designed around its process. Equipment, lifting, power, extract, storage, waste, noise and circulation should be identified before design is settled.
Typical requirements
- Inventory process, machinery, materials and vehicles.
- Define ventilation or extract, power and fire safety.
- Coordinate circulation, storage, noise and auxiliary services.
Engineering requirements
Services to resolve the project as one coordinated whole
Commercial premises approvals
A premises-approval package aligns the intended use with the property. Scope follows a review of location, area, condition, occupancy and required building services.
02Feasibility studies
Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.
03MEP building-services engineering
We provide MEP engineering from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.
04Electrical installations
The electrical solution starts from expected loads, distribution, protection and coordination with other services.
05Fire safety
We integrate escape, compartmentation and protection systems with layout, building services and intended use.
FAQ
Frequently asked questions
What information is most important?
The work process, machinery, power ratings, materials and expected number and type of vehicles or people.
Next step
