Opening a venue
Occupancy, escape, noise and services shape the venue
Feasibility should be checked before committing to premises, layout and equipment for a high-occupancy amplified-music activity.
Venues and nightclubs require early coordination of their surroundings, escape, acoustics, ventilation, power and fire safety.
Typical requirements
- Assess occupancy, routes and escape.
- Coordinate acoustic insulation, ventilation and HVAC.
- Define electricity, lighting and fire safety.
Engineering requirements
Services to resolve the project as one coordinated whole
Activity projects
An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.
02Feasibility studies
Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.
03Air conditioning and HVAC
The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.
04Electrical installations
The electrical solution starts from expected loads, distribution, protection and coordination with other services.
05Fire safety
We integrate escape, compartmentation and protection systems with layout, building services and intended use.
FAQ
Preguntas frecuentes
Should premises be assessed before leasing?
Yes. Geometry, neighbours, escape, acoustic insulation and service space can determine feasibility and adaptation cost.