---
title: "Ventilation design in Mallorca | Roca Ingenieros"
description: "Ventilation and indoor-air-quality design for activities and buildings with calculations, distribution, coordination, drawings and documents."
canonical: "https://roca.ing/en-gb/servicios/ventilacion/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Services](https://roca.ing/en-gb/servicios/)
3.  Ventilation

The air each use needs

# Ventilation calculated for each use

We relate occupancy, activity and layout to airflow, intake, discharge, space and controls.

[Request a ventilation project](https://roca.ing/en-gb/contacto/?tipo=hvac&disciplina=ventilacion)

![Ilustración técnica de instalaciones coordinadas en un edificio](https://roca.ing/_astro/installations-technical-drawing.BOujfMie_ZNkFBP.webp)

Esquema técnico · Instalaciones

Ventilation is coordinated with HVAC, architecture, noise, fire safety and energy consumption.

First conversation

## We help define the next step

With the objective, location, stage and available information, we can advise you and prepare a clear scope.

01

## What we resolve

-   Define airflow from use and occupancy.
-   Coordinate ductwork and equipment with architecture.
-   Resolve intake and discharge without transferring problems to the surroundings.

02

## What we deliver

-   Ventilation calculations and criteria.
-   Drawings, schematics and quantities.
-   Coordination and documentation within scope.

03

## What we need to start

-   Drawings, use, occupancy and contaminant-generating equipment.

How we work

## A clear process from first information to delivery

1.  01
    
    Review use, occupancy and geometry.
    
2.  02
    
    Define strategy and routes.
    
3.  03
    
    Calculate, coordinate and document.
    

Applications

## Projects and teams this service can support

[01For professionals↗

### Architects

We can join from feasibility and concept design through detailed design, quantities, legalisation and construction support. Our proposal identifies disciplines, milestones, formats and responsibilities.](https://roca.ing/en-gb/para/arquitectos/)[02For professionals↗

### Contractors

On site, programme, interfaces and timely information matter. We set responsibilities, response times and deliverables in the proposal.](https://roca.ing/en-gb/para/constructoras/)[03For professionals↗

### Installation contractors

Collaboration works when design and installation share reliable data, controlled versions and clear responsibilities.](https://roca.ing/en-gb/para/instaladoras/)[04Project type↗

### Restaurants

Extract, ventilation, HVAC, power, fire safety, accessibility, escape, noise and health conditions can constrain restaurant premises and refurbishment.](https://roca.ing/en-gb/sectores/restaurantes/)[05Project type↗

### Bars

A bar shares requirements with food service, but hours, music, occupancy, food preparation and the specific premises change acoustics, ventilation, escape and services.](https://roca.ing/en-gb/sectores/bares/)[06Project type↗

### Gyms

High occupancy, physical activity, music, impacts and equipment make ventilation, HVAC, acoustics, structure, escape and water particularly important.](https://roca.ing/en-gb/sectores/gimnasios/)[07Project type↗

### Offices

A flexible office, professional practice and customer-service centre have different densities and programmes. Occupancy guides comfort, air and energy.](https://roca.ing/en-gb/sectores/oficinas/)[08Project type↗

### Industrial buildings

An industrial building is not defined by structure alone. Use, process, services, fire safety, power and future expansion must be coordinated from the outset.](https://roca.ing/en-gb/sectores/naves-industriales/)

[View all sectors ↗](https://roca.ing/en-gb/sectores/)

You may also need

## Services that complete the project

[01↗

### Air conditioning and HVAC

The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.](https://roca.ing/en-gb/servicios/climatizacion/)[02↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[03↗

### Building-services engineering

We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.](https://roca.ing/en-gb/servicios/ingenieria-de-instalaciones/)

FAQ

## Preguntas frecuentes

Are ventilation and air conditioning the same?

No. Ventilation replaces and treats outdoor air while air conditioning controls thermal conditions; the two must be coordinated.

Siguiente paso

## Ventilation calculated for each use

[Request a ventilation project](https://roca.ing/en-gb/contacto/?tipo=hvac&disciplina=ventilacion)
