---
title: "Fire-safety engineering in Mallorca | Roca"
description: "Fire-safety design and coordination for activities, buildings and industrial facilities with drawings, calculations and technical documents."
canonical: "https://roca.ing/en-gb/servicios/proteccion-contra-incendios/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Services](https://roca.ing/en-gb/servicios/)
3.  Fire safety

Integrated protection

# Fire safety coordinated with use, escape and services

We define the measures required by the project and integrate them with architecture, activity and installation.

[Review fire safety](https://roca.ing/en-gb/contacto/?tipo=pci)

![Ilustración técnica de instalaciones coordinadas en un edificio](https://roca.ing/_astro/installations-technical-drawing.BOujfMie_ZNkFBP.webp)

Esquema técnico · Instalaciones

We integrate escape, compartmentation and protection systems with layout, building services and intended use.

First conversation

## We help define the next step

With the objective, location, stage and available information, we can advise you and prepare a clear scope.

01

## What we resolve

-   Coordinate escape, compartmentation and protection measures.
-   Integrate fire-safety systems with architecture and other disciplines.
-   Document scope for design, construction or legalisation.

02

## What we deliver

-   In-scope criteria and justification.
-   Calculations and system definition where applicable.
-   Drawings, schematics and quantities.

03

## What we need to start

-   Drawings, use, areas and expected occupancy.

How we work

## A clear process from first information to delivery

1.  01
    
    Review use, configuration and building conditions.
    
2.  02
    
    Define applicable criteria and systems.
    
3.  03
    
    Coordinate and document the solution.
    

Applications

## Projects and teams this service can support

[01For professionals↗

### Architects

We can join from feasibility and concept design through detailed design, quantities, legalisation and construction support. Our proposal identifies disciplines, milestones, formats and responsibilities.](https://roca.ing/en-gb/para/arquitectos/)[02For professionals↗

### Contractors

On site, programme, interfaces and timely information matter. We set responsibilities, response times and deliverables in the proposal.](https://roca.ing/en-gb/para/constructoras/)[03Project type↗

### Restaurants

Extract, ventilation, HVAC, power, fire safety, accessibility, escape, noise and health conditions can constrain restaurant premises and refurbishment.](https://roca.ing/en-gb/sectores/restaurantes/)[04Project type↗

### Industrial buildings

An industrial building is not defined by structure alone. Use, process, services, fire safety, power and future expansion must be coordinated from the outset.](https://roca.ing/en-gb/sectores/naves-industriales/)[05Project type↗

### Hotels

Bedrooms, common areas, kitchens, pools and technical zones need different criteria and careful coordination with operation and construction phases.](https://roca.ing/en-gb/sectores/hoteles/)

[View all sectors ↗](https://roca.ing/en-gb/sectores/)

You may also need

## Services that complete the project

[01↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[02↗

### Building-services engineering

We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.](https://roca.ing/en-gb/servicios/ingenieria-de-instalaciones/)

FAQ

## Preguntas frecuentes

Is fire safety part of an activity project?

It can form part of the activity's justifications and installations. Scope depends on the use and building.

Siguiente paso

## Fire safety coordinated with use, escape and services

[Review fire safety](https://roca.ing/en-gb/contacto/?tipo=pci)
