---
title: "Water and drainage design in Mallorca | Roca"
description: "Water and drainage engineering for buildings and activities, with calculations, schematics, drawings, quantities and technical coordination."
canonical: "https://roca.ing/en-gb/servicios/fontaneria/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Services](https://roca.ing/en-gb/servicios/)
3.  Water and drainage

Water and drainage

# Water and drainage coordinated with the building

We define demand, distribution, generation, discharge and technical spaces with architecture and other services.

[Discuss water and drainage](https://roca.ing/en-gb/contacto/?tipo=b2b&disciplina=fontaneria)

![Ilustración técnica de instalaciones coordinadas en un edificio](https://roca.ing/_astro/installations-technical-drawing.BOujfMie_ZNkFBP.webp)

Esquema técnico · Instalaciones

We design supply, generation and drainage networks so water systems fit the architecture and other building services.

First conversation

## We help define the next step

With the objective, location, stage and available information, we can advise you and prepare a clear scope.

01

## What we resolve

-   Size supply and drainage.
-   Coordinate risers, equipment, falls and levels.
-   Document networks and outlets.

02

## What we deliver

-   Calculations and schematics.
-   Drawings and quantities.
-   Agreed coordination and technical documentation.

03

## What we need to start

-   Drawings, uses, equipment and available supply data.

How we work

## A clear process from first information to delivery

1.  01
    
    Inventory uses and outlets.
    
2.  02
    
    Define networks and equipment.
    
3.  03
    
    Calculate, coordinate and document.
    

Applications

## Projects and teams this service can support

[01For professionals↗

### Architects

We can join from feasibility and concept design through detailed design, quantities, legalisation and construction support. Our proposal identifies disciplines, milestones, formats and responsibilities.](https://roca.ing/en-gb/para/arquitectos/)[02For professionals↗

### Contractors

On site, programme, interfaces and timely information matter. We set responsibilities, response times and deliverables in the proposal.](https://roca.ing/en-gb/para/constructoras/)[03For professionals↗

### Installation contractors

Collaboration works when design and installation share reliable data, controlled versions and clear responsibilities.](https://roca.ing/en-gb/para/instaladoras/)[04Project type↗

### Restaurants

Extract, ventilation, HVAC, power, fire safety, accessibility, escape, noise and health conditions can constrain restaurant premises and refurbishment.](https://roca.ing/en-gb/sectores/restaurantes/)[05Project type↗

### Hotels

Bedrooms, common areas, kitchens, pools and technical zones need different criteria and careful coordination with operation and construction phases.](https://roca.ing/en-gb/sectores/hoteles/)[06Project type↗

### Homes and villas

HVAC, hot-water production, electricity and photovoltaic decisions affect space, cost, comfort and maintenance in residential projects.](https://roca.ing/en-gb/sectores/viviendas/)[07Project type↗

### Hair salons

Hair salons combine electrical workstations, wash areas, storage and customer service. Layout must coordinate existing and proposed services.](https://roca.ing/en-gb/sectores/peluquerias/)

[View all sectors ↗](https://roca.ing/en-gb/sectores/)

You may also need

## Services that complete the project

[01↗

### Building-services engineering

We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.](https://roca.ing/en-gb/servicios/ingenieria-de-instalaciones/)[02↗

### Air conditioning and HVAC

The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.](https://roca.ing/en-gb/servicios/climatizacion/)

FAQ

## Preguntas frecuentes

Does it include drainage?

It can. The proposal identifies included networks, equipment and documents to avoid gaps between disciplines.

Siguiente paso

## Water and drainage coordinated with the building

[Discuss water and drainage](https://roca.ing/en-gb/contacto/?tipo=b2b&disciplina=fontaneria)
