---
title: "Activity project for a workshop in Mallorca | Roca"
description: "Engineering for workshops covering equipment layout, ventilation, electricity, fire safety, storage, noise and activity documentation."
canonical: "https://roca.ing/en-gb/sectores/talleres/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Project types](https://roca.ing/en-gb/sectores/)
3.  Workshops

Opening a workshop

# Process, equipment and risk define the workshop project

We start from the process, machinery and materials to assess the premises and services.

[Assess a workshop](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=taller)

A workshop is designed around its process. Equipment, lifting, power, extract, storage, waste, noise and circulation should be identified before design is settled.

## Typical requirements

-   Inventory process, machinery, materials and vehicles.
-   Define ventilation or extract, power and fire safety.
-   Coordinate circulation, storage, noise and auxiliary services.

Engineering requirements

## Services to resolve the project as one coordinated whole

[01↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[02↗

### Feasibility studies

Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.](https://roca.ing/en-gb/servicios/estudios-de-viabilidad/)[03↗

### Building-services engineering

We work from feasibility and design through construction coordination and final documents, as an integrated service or by discipline.](https://roca.ing/en-gb/servicios/ingenieria-de-instalaciones/)[04↗

### Electrical installations

The electrical solution starts from expected loads, distribution, protection and coordination with other services.](https://roca.ing/en-gb/servicios/instalaciones-electricas/)[05↗

### Fire safety

We integrate escape, compartmentation and protection systems with layout, building services and intended use.](https://roca.ing/en-gb/servicios/proteccion-contra-incendios/)

FAQ

## Preguntas frecuentes

What information is most important?

The work process, machinery, power ratings, materials and expected number and type of vehicles or people.

Siguiente paso

## Process, equipment and risk define the workshop project

[Assess a workshop](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=taller)
