---
title: "Activity project for a restaurant in Mallorca | Roca"
description: "Feasibility and activity projects for restaurants coordinating ventilation, HVAC, electricity, fire safety and accessibility."
canonical: "https://roca.ing/en-gb/sectores/restaurantes/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Project types](https://roca.ing/en-gb/sectores/)
3.  Restaurants

Opening a restaurant

# A restaurant must coordinate activity, kitchen and services

We assess the premises before design and translate use, occupancy, kitchen and dining areas into coordinated technical requirements.

[Check restaurant feasibility](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=restaurante)

Extract, ventilation, HVAC, power, fire safety, accessibility, escape, noise and health conditions can constrain restaurant premises and refurbishment.

## Typical requirements

-   Check premises before committing investment.
-   Coordinate kitchen, extract, ventilation and HVAC.
-   Define power, fire safety, escape, occupancy and accessibility as required.

Engineering requirements

## Services to resolve the project as one coordinated whole

[01↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[02↗

### Feasibility studies

Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.](https://roca.ing/en-gb/servicios/estudios-de-viabilidad/)[03↗

### Air conditioning and HVAC

The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.](https://roca.ing/en-gb/servicios/climatizacion/)[04↗

### Electrical installations

The electrical solution starts from expected loads, distribution, protection and coordination with other services.](https://roca.ing/en-gb/servicios/instalaciones-electricas/)[05↗

### Fire safety

We integrate escape, compartmentation and protection systems with layout, building services and intended use.](https://roca.ing/en-gb/servicios/proteccion-contra-incendios/)

FAQ

## Preguntas frecuentes

Should extract be checked before leasing?

Yes. Route, discharge point and available space can constrain layout, building work and technical feasibility.

Siguiente paso

## A restaurant must coordinate activity, kitchen and services

[Check restaurant feasibility](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=restaurante)
