---
title: "Activity project for a nightclub in Mallorca | Roca"
description: "Engineering for venues and nightclubs covering occupancy, escape, acoustics, ventilation, HVAC, electricity and fire safety."
canonical: "https://roca.ing/en-gb/sectores/discotecas/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Project types](https://roca.ing/en-gb/sectores/)
3.  Nightclubs and venues

Opening a venue

# Occupancy, escape, noise and services shape the venue

Feasibility should be checked before committing to premises, layout and equipment for a high-occupancy amplified-music activity.

[Assess a venue or nightclub](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=discoteca)

Venues and nightclubs require early coordination of their surroundings, escape, acoustics, ventilation, power and fire safety.

## Typical requirements

-   Assess occupancy, routes and escape.
-   Coordinate acoustic insulation, ventilation and HVAC.
-   Define electricity, lighting and fire safety.

Engineering requirements

## Services to resolve the project as one coordinated whole

[01↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[02↗

### Feasibility studies

Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.](https://roca.ing/en-gb/servicios/estudios-de-viabilidad/)[03↗

### Air conditioning and HVAC

The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.](https://roca.ing/en-gb/servicios/climatizacion/)[04↗

### Electrical installations

The electrical solution starts from expected loads, distribution, protection and coordination with other services.](https://roca.ing/en-gb/servicios/instalaciones-electricas/)[05↗

### Fire safety

We integrate escape, compartmentation and protection systems with layout, building services and intended use.](https://roca.ing/en-gb/servicios/proteccion-contra-incendios/)

FAQ

## Preguntas frecuentes

Should premises be assessed before leasing?

Yes. Geometry, neighbours, escape, acoustic insulation and service space can determine feasibility and adaptation cost.

Siguiente paso

## Occupancy, escape, noise and services shape the venue

[Assess a venue or nightclub](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=discoteca)
