---
title: "Activity project for a bar in Mallorca | Roca"
description: "Feasibility and activity projects for bars covering occupancy, ventilation, HVAC, electricity, fire safety, noise and accessibility."
canonical: "https://roca.ing/en-gb/sectores/bares/"
language: "en"
---

1.  [Home](https://roca.ing/en-gb/)
2.  [Project types](https://roca.ing/en-gb/sectores/)
3.  Bars

Opening a bar

# Premises, occupancy and atmosphere shape a bar project

We assess the bar, customer areas, ventilation, noise and services before the refurbishment is settled.

[Check the bar's feasibility](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=bar)

A bar shares requirements with food service, but hours, music, occupancy, food preparation and the specific premises change acoustics, ventilation, escape and services.

## Typical requirements

-   Check use, occupancy and layout.
-   Coordinate ventilation, HVAC, power and fire safety.
-   Assess noise, accessibility and escape where required.

Engineering requirements

## Services to resolve the project as one coordinated whole

[01↗

### Activity projects

An activity project coordinates intended use with the premises. Scope follows a review of location, area, condition, occupancy and required services.](https://roca.ing/en-gb/servicios/proyectos-de-actividad/)[02↗

### Feasibility studies

Feasibility does not replace the later project; it reduces uncertainty while there is still room to choose premises, layout or scope.](https://roca.ing/en-gb/servicios/estudios-de-viabilidad/)[03↗

### Air conditioning and HVAC

The project coordinates thermal demand, ventilation, indoor air quality, generation and distribution with architecture, electricity and controls.](https://roca.ing/en-gb/servicios/climatizacion/)[04↗

### Electrical installations

The electrical solution starts from expected loads, distribution, protection and coordination with other services.](https://roca.ing/en-gb/servicios/instalaciones-electricas/)[05↗

### Fire safety

We integrate escape, compartmentation and protection systems with layout, building services and intended use.](https://roca.ing/en-gb/servicios/proteccion-contra-incendios/)

FAQ

## Preguntas frecuentes

Do a bar and restaurant need the same project?

Not necessarily. We review the activity, kitchen or food preparation, occupancy, hours, music, premises and services before defining scope.

Siguiente paso

## Premises, occupancy and atmosphere shape a bar project

[Check the bar's feasibility](https://roca.ing/en-gb/contacto/?tipo=actividad&sector=bar)
